Auto workshop fly through

Auto workshop fly through

Telcalemit were commissioned to install a new oil, grease and water lines at each workstation in the workshop. These were fed through lines neatly installed around the workshop. I created a short video with my drone to showcase this...
Altona Pier Redevelopment

Altona Pier Redevelopment

The Altona Pier rebuild was completed in January 2024. The historic Altona Pier was treated to an $11.9 million makeover, transforming into a huge walkway that stretches more than 300 metres out to sea. The new pier has a modern design with a Y-shape that creates two...