Case Studies

Auto workshop fly through

Auto workshop fly through

https://youtu.be/48blcj1rsKw Telcalemit were commissioned to install a new oil, grease and water lines at each workstation in the workshop. These...

read more
Alma Doepel Restoration

Alma Doepel Restoration

https://youtu.be/3yVnQ6ajor8?si=oL_bknMr8q9MC2wM Alma Doepel was built in 1903 in Bellingen, NSW, by Frederik Doepel, and named after his youngest...

read more
Altona Pier Redevelopment

Altona Pier Redevelopment

The Altona Pier rebuild was completed in January 2024. The historic Altona Pier was treated to an $11.9 million makeover, transforming into a huge...

read more